Project

Cutting & Trenching at Le Roy Middle School

Location

Le Roy, NY

Owner

Le Roy CSD

Duration

5 Weeks

Project Overview

Westside Construction Group recently completed a specialized project at LeRoy Central School, involving concrete cutting and trenching to facilitate plumbing installations. This project was part of the school’s renovations for new offices and educational spaces. The work required careful planning and execution, including Ground Penetrating Radar (GPR) to avoid live electrical lines.

Project Details

Location: Le Roy, NY
Scope of Work: Concrete Cutting, Trenching, Sanitary Sewer Access, GPR for Electrical Lines

Project Objectives

The primary objectives of this project were to:

  • Sawcut and Dig Trenches: Perform concrete cutting and manual excavation to access the sanitary sewer lines.
  • Facilitate Plumbing Installations: Create trenches to allow the plumbing company to install new sanitary sewer lines.
  • Use GPR for Safety: Utilize Ground Penetrating Radar (GPR) to detect and avoid live electrical lines due to the lack of accurate as-built electrical drawings.

Challenges and Solutions

Concrete Cutting and Trenching

  • Challenge: Sawcutting and digging trenches required precision to reach the sanitary sewer lines without disrupting the existing infrastructure.
  • Solution: Our team used advanced sawcutting equipment and both manual and mechanical excavation techniques to create accurate and clean trenches. This ensured safe and efficient access to the sanitary sewer lines.

Plumbing Facilitation

  • Challenge: The primary goal was to provide clear and accessible trenches for the plumbing company to install new sanitary sewer lines.
  • Solution: We coordinated closely with the plumbing team to ensure the trenches met their specifications and allowed for seamless installation of the new sewer lines.

GPR for Electrical Line Detection

  • Challenge: Given the school’s age and lack of accurate electrical drawings, there was a significant risk of hitting live electrical lines during excavation.
  • Solution: We employed Ground Penetrating Radar (GPR) to scan the floor and identify the locations of live electrical lines. This technology enabled us to avoid any potential hazards and proceed with the excavation safely.

Results

  • Precise Trenching: Successfully sawcut and excavated trenches to access the sanitary sewer lines, facilitating plumbing installations.
  • Safe and Efficient Operations: Utilized GPR to avoid live electrical lines, ensuring a safe working environment.
  • Seamless Coordination: Worked closely with the plumbing company to ensure the trenches met all requirements, allowing for efficient installation.

Why Choose Westside Construction Group for Concrete Cutting and Trenching?

  • Expertise in Specialized Projects: Our team has extensive experience in handling complex concrete cutting and trenching projects with precision.
  • Advanced Technology: We use the latest equipment and technologies, such as GPR, to ensure safety and accuracy.
  • Commitment to Quality: We prioritize quality in every aspect of our work, from initial planning to final execution.
  • Reliable and Efficient: Our dedication to client satisfaction ensures every project is completed on time and within budget.