Project

Core Drilling at Cazenovia College

Location

Cazenovia, NY

Owner

Cazenovia College

Duration

3 Weeks

Project Overview

Westside Construction Group recently completed a core drilling project at Cazenovia College, providing precise and efficient core extraction services to support the installation of new radiators, and the repair of steam and sanitary piping. Our team was tasked with drilling 1,500 core samples of varying sizes and depths across the campus, ensuring minimal disruption to the college’s daily operations.

Project Details

Location: Cazenovia, NY
Scope of Work: Core Drilling for Radiator Installation and Piping Repairs
Core Sizes: 2 inches to 10 inches in diameter
Depth: Up to 24 inches
Number of Cores: 1,500

Project Objectives

The primary objectives of this project were to:

  • Extract Core Samples: Drill 1,500 core holes ranging from 2 inches to 10 inches in diameter and up to 24 inches deep to facilitate new radiator installations and repair steam and sanitary piping.
  • Minimize Disruption: Conduct drilling operations with minimal interference to the daily activities of students and staff.
  • Ensure Safety: Adhere to stringent safety protocols to protect both our team and the college community during the drilling process.

Challenges and Solutions

Limited Access Areas

  • Challenge: Some drilling locations were in restricted or hard-to-reach areas, posing challenges for equipment setup and operation.
  • Solution: Our team utilized portable and adaptable drilling rigs designed for confined spaces, ensuring we could access and drill in all required locations without compromising on precision or safety.

Water Control in Dorm Rooms and Offices

  • Challenge: Managing water control in dorm rooms and offices was essential to prevent water damage and ensure a safe environment for students and staff.
  • Solution: We implemented specialized drilling techniques to accommodate the installation of water control systems. Our team worked closely with Cazenovia College's maintenance staff to ensure proper integration of these systems, effectively preventing water-related issues and maintaining a dry, safe environment.

Results

  • Precise Core Extraction: Successfully drilled 1,500 core holes of varying sizes and depths, providing Cazenovia College with the necessary access for their new radiators and piping repairs.
  • On-Time Completion: Completed the project within the agreed timeframe, ensuring no delays to the college's overall renovation schedule.
  • Safety Record: Achieved a zero-incident safety record, demonstrating our commitment to maintaining a safe working environment for both our team and the college community.

Why Choose Westside Construction Group for Core Drilling?

  • Expertise and Precision: Our team has extensive experience in core drilling, ensuring accurate and clean core extractions for any project requirements.
  • Advanced Equipment: We use state-of-the-art drilling rigs and tools, capable of performing in various environments, including restricted and confined spaces.
  • Commitment to Safety: Safety is our top priority. We follow stringent safety protocols to protect our team, clients, and the surrounding environment during all drilling operations.
  • Minimal Disruption: We plan and execute our drilling operations to minimize impact on our clients' daily activities, ensuring a smooth and hassle-free project experience.

Contact Us

If you have a project that requires precise and efficient core drilling services, contact Westside Construction Group today. Our expert team is ready to help you achieve your project goals with our reliable and professional drilling solutions.

Related

similar projects

No Projects found.