Project

Concrete Cutting at Seneca Falls District Offices

Location

Seneca Falls, NY

Owner

Seneca Falls CSD

Duration

2 Weeks

Project Overview

Westside Construction Group recently completed a core drilling project at Seneca Falls Central School District (CSD) Office. The project involved precise drilling for HVAC ductwork and piping, as well as the pouring of boiler and utility pads. Our expert team ensured that all work was carried out with the highest level of accuracy and care to maintain the structural integrity of the newly poured flooring.

Project Details

  • Location: Seneca Falls, NY
  • Scope of Work: Core Drilling for HVAC Ductwork and Piping, Concrete Chainsaw Cutting, Boiler and Utility Pad Installation

Project Objectives

The primary objectives of this project were to:

  1. Precision Core Drilling: Create precise holes for HVAC ductwork and piping without compromising structural integrity.
  2. Concrete Chainsaw Cutting: Utilize a concrete chainsaw to prevent over-cutting and ensure clean, accurate cuts.
  3. Pour Boiler and Utility Pads: Install several boiler and utility pads to support new equipment.

Challenges and Solutions

Precision Core Drilling

Drilling precise holes for HVAC ductwork and piping required accuracy to avoid damaging the newly poured flooring.

Solution: Our team used advanced core drilling equipment to create clean, precise holes for the HVAC installations, ensuring no damage to the surrounding structure.

Preventing Over-Cutting

To avoid compromising the structural integrity of the newly poured flooring, it was essential to prevent any over-cutting.

Solution: We utilized a concrete chainsaw, which allowed for precise cutting without over-cutting, ensuring the structural integrity of the flooring was maintained.

Boiler and Utility Pad Installation

Pouring boiler and utility pads required careful planning and execution to ensure proper support for the new equipment.

Solution: Our team carefully poured and finished the boiler and utility pads, ensuring they met all specifications and provided a stable base for the new installations.

Results

  • Accurate Core Drilling: Successfully drilled precise holes for HVAC ductwork and piping, maintaining the structural integrity of the flooring.
  • Clean and Precise Cuts: Utilized a concrete chainsaw to achieve accurate cuts without over-cutting, ensuring clean edges and stability.
  • Stable Boiler and Utility Pads: Installed boiler and utility pads that provided a strong and reliable base for the new equipment.

Why Choose Westside Construction Group for Core Drilling Projects?

  • Expertise in Precision Drilling: Our team has extensive experience in core drilling, ensuring precise and accurate results for your project.
  • Advanced Equipment: We use state-of-the-art drilling and cutting equipment to achieve the highest quality standards.
  • Commitment to Safety: Safety is our top priority. We follow strict safety protocols to protect our team, clients, and the structural integrity of your project.
  • Reliable and Efficient: Our dedication to client satisfaction ensures every project is completed on time and within budget.