Project

Demolition at Oswego Middle School

Location

Oswego, NY

Owner

Oswego Central School

Duration

5 Weeks

Project Overview

Westside Construction Group recently completed a challenging demolition project at Oswego Middle School, focusing on the removal of old boiler systems, steam lines, fuel oil lines, and HVAC ductwork from the basement. This project was essential to facilitate the installation of new, more efficient units in a confined and tight-quarters environment.

Project Details

Location: Oswego, NY
Scope of Work: Demolition and Removal of Boiler, Steam Lines, Fuel Oil Lines, and HVAC Ductwork

Project Objectives

The primary objectives of this project were to:

  • Demolish and Remove Boiler Systems: Safely dismantle and remove the existing boiler systems from the basement.
  • Remove Steam and Fuel Oil Lines: Carefully extract old steam and fuel oil lines without damaging surrounding structures.
  • Demolish HVAC Ductwork: Remove outdated HVAC ductwork to clear the area for new installations.
  • Operate in Tight Quarters: Navigate the confined space in the basement to ensure all components were safely removed.

Challenges and Solutions

Tight Quarters in Basement

  • Challenge: The confined space in the basement presented challenges for maneuvering and safely removing large equipment and lines.
  • Solution: Our team used specialized tools and equipment designed for tight spaces, and carefully planned the demolition process to ensure safe and efficient removal of all components.

Safe Removal of Hazardous Materials

  • Challenge: Handling steam lines and fuel oil lines required caution to prevent leaks or contamination.
  • Solution: We followed strict safety protocols, including the use of protective gear and proper ventilation, to safely remove and dispose of hazardous materials.

Coordination with New Installations

  • Challenge: The demolition work needed to be precisely coordinated with the installation schedule of new units.
  • Solution: We worked closely with the installation team to ensure our demolition schedule aligned with their needs, minimizing downtime and ensuring a smooth transition to the new systems.

Results

  • Successful Demolition: Safely demolished and removed all targeted systems from the basement.
  • Efficient Operations: Managed to work effectively within the tight confines of the basement, ensuring all components were removed without incident.
  • Prepared for New Installations: Cleared the area, allowing for the timely installation of new boiler, steam, fuel oil, and HVAC systems.

Why Choose Westside Construction Group for Demolition Projects?

  • Expertise in Challenging Environments: Our team excels in handling demolition projects in confined and difficult-to-access areas.
  • Safety and Precision: We prioritize safety and precision in every aspect of our demolition work, ensuring all materials are handled and removed properly.
  • Reliable Coordination: Our ability to coordinate with other teams ensures seamless project execution and minimal disruption.