Project

Footers at Cleveland Hill High School

Location

Cheektowaga, NY

Owner

Cleveland Hill UFSD

Duration

1 Month

Project Overview

Westside Construction Group recently completed a comprehensive project at Cleveland Hill High School, involving the demolition of an old snack shelter and the construction of a footer for a new one. Additionally, we poured an ADA-compliant ramp to improve accessibility from the parking lot sidewalk into the building. This project required achieving 98% compaction to ensure a stable foundation.

Project Details

Location: Cheektowaga, NY
Scope of Work: Demolition of Snack Shelter, Footer Construction, and ADA Ramp Installation

Project Objectives

The primary objectives of this project were to:

  • Demolish Existing Snack Shelter: Safely and efficiently demolish the old snack shelter to clear the area for new construction.
  • Construct Footer: Pour a stable and durable footer for the new snack shelter, ensuring 98% compaction for a solid foundation.
  • Install ADA Ramp: Pour an ADA-compliant ramp leading from the parking lot sidewalk into the building to enhance accessibility.

Challenges and Solutions

Demolition of Snack Shelter

  • Challenge: The existing snack shelter needed to be demolished carefully to avoid damage to surrounding areas.
  • Solution: Our team used specialized demolition tools and techniques to safely dismantle the shelter, ensuring the site was ready for new construction.

Achieving 98% Compaction

  • Challenge: Ensuring the footer reached 98% compaction was crucial for the stability of the new snack shelter.
  • Solution: We used advanced compaction equipment and conducted regular compaction tests to meet the required standards, ensuring a solid and stable footer.

Pouring the ADA Ramp

  • Challenge: Constructing the ADA ramp required precision to meet accessibility standards and ensure smooth access.
  • Solution: Our team carefully measured and poured the ramp, adhering to ADA guidelines to create a safe and accessible pathway from the parking lot sidewalk to the building.

Results

  • Successful Demolition: Safely demolished the old snack shelter, preparing the site for new construction.
  • Stable Footer Construction: Achieved 98% compaction and poured a durable footer for the new snack shelter.
  • Accessible ADA Ramp: Installed an ADA-compliant ramp, enhancing accessibility and meeting all necessary standards.

Why Choose Westside Construction Group for Your Construction Projects?

  • Expertise in Comprehensive Projects: Our team has extensive experience in managing complex construction projects, ensuring precision and efficiency.
  • Commitment to Quality: We prioritize quality in every aspect of our work, from demolition to construction and accessibility improvements.
  • Focus on Accessibility: We are dedicated to creating accessible environments, adhering to ADA guidelines and standards.
  • Reliable Results: Our dedication to client satisfaction ensures every project meets the highest standards of quality and reliability.