Project Overview

Westside Construction Group recently completed a comprehensive project at Cleveland Hill High School, involving the demolition of an old snack shelter and the construction of a footer for a new one. Additionally, we poured an ADA-compliant ramp to improve accessibility from the parking lot sidewalk into the building. This project required achieving 98% compaction to ensure a stable foundation.

Project Details

  • Location: Cheektowaga, NY
  • Scope of Work: Demolition of Snack Shelter, Footer Construction, and ADA Ramp Installation

Project Objectives

The primary objectives of this project were to:

  1. Demolish Existing Snack Shelter: Safely and efficiently demolish the old snack shelter to clear the area for new construction.
  2. Construct Footer: Pour a stable and durable footer for the new snack shelter, ensuring 98% compaction for a solid foundation.
  3. Install ADA Ramp: Pour an ADA-compliant ramp leading from the parking lot sidewalk into the building to enhance accessibility.

Challenges and Solutions

Demolition of Snack Shelter

The existing snack shelter needed to be demolished carefully to avoid damage to surrounding areas.

Solution: Our team used specialized demolition tools and techniques to safely dismantle the shelter, ensuring the site was ready for new construction.

Achieving 98% Compaction

Ensuring the footer reached 98% compaction was crucial for the stability of the new snack shelter.

Solution: We used advanced compaction equipment and conducted regular compaction tests to meet the required standards, ensuring a solid and stable footer.

Pouring the ADA Ramp

Constructing the ADA ramp required precision to meet accessibility standards and ensure smooth access.

Solution: Our team carefully measured and poured the ramp, adhering to ADA guidelines to create a safe and accessible pathway from the parking lot sidewalk to the building.

Results

  • Successful Demolition: Safely demolished the old snack shelter, preparing the site for new construction.
  • Stable Footer Construction: Achieved 98% compaction and poured a durable footer for the new snack shelter.
  • Accessible ADA Ramp: Installed an ADA-compliant ramp, enhancing accessibility and meeting all necessary standards.

Why Choose Westside Construction Group for Your Construction Projects?

  • Expertise in Comprehensive Projects: Our team has extensive experience in managing complex construction projects, ensuring precision and efficiency.
  • Commitment to Quality: We prioritize quality in every aspect of our work, from demolition to construction and accessibility improvements.