Project

Site Work for EV Charging Station in Oklahoma

Location

Sayre, OK

Owner

Pilot Flying J

Duration

1 Month

Project Overview

Westside Construction Group recently completed a comprehensive site work project for a Pilot Flying J EV Charging Station. The project involved a range of tasks from trenching for conduit to ensuring clean working conditions, all while coordinating with electricians and maintaining site security.

Project Details

  • Location: Sayre, OK
  • Scope of Work: Trenching for Conduit, Asphalt Removal, Spoil Removal, Coordination with Electricians, Site Security, Clean Working Conditions, Installation of Pads, Sidewalks, Threaded Rods, and Bollards

Project Objectives

The primary objectives of this project were to:

  1. Trench for Conduit: Excavate trenches to lay conduit for the electrical wiring necessary for the EV charging stations.
  2. Remove Asphalt and Spoils: Safely remove existing asphalt and dispose of spoils to prepare the site for new installations.
  3. Coordinate with Electricians: Work closely with electricians to ensure the accurate placement of conduits and other electrical components.
  4. Secure the Site: Install temporary fencing to secure the site and ensure safety for the public and workers.
  5. Maintain Clean Working Conditions: Keep the work area clean and safe, as the travel center remained open to the public during the project.
  6. Pour Pads and Sidewalks: Install new concrete pads and sidewalks to support the EV charging units and provide accessible pathways.
  7. Set Threaded Rods and Bollards: Install threaded rods and bollards to secure the EV units in place, ensuring they are ready to be received by the bolts.

Challenges and Solutions

Trenching and Asphalt Removal

Trenching for conduit and removing asphalt required precision to avoid disrupting existing infrastructure.

Solution: Our team used advanced excavation equipment to create precise trenches and remove asphalt efficiently, ensuring minimal disruption to the surrounding areas.

Coordination with Electricians

Close coordination with electricians was essential to ensure the proper installation of electrical components.

Solution: We maintained open communication with the electrical team, scheduling our work to align with their needs and ensuring all conduits and components were correctly placed.

Site Security and Cleanliness

Maintaining a secure and clean work environment was crucial as the site remained open to the public.

Solution: We installed temporary fencing around the work area and implemented strict cleanliness protocols to ensure the safety and comfort of the public and workers.

Results

  • Successful Trenching and Installation: Accurately trenched and installed conduits, ensuring a reliable electrical setup for the EV charging stations.
  • Clean and Safe Site: Maintained a clean and secure work environment, minimizing disruption to the travel center’s operations.
  • Quality Construction: Installed durable concrete pads, sidewalks, threaded rods, and bollards, ensuring the EV units were securely and accurately positioned.

Why Choose Westside Construction Group for Site Work Projects?

  • Expertise in Comprehensive Site Work: Our team handles all aspects of site work with precision and efficiency.
  • Advanced Equipment: We use state-of-the-art equipment to deliver high-quality results.
  • Commitment to Safety: Safety is our top priority. We follow strict safety protocols to protect our team, clients, and the public.
  • Reliable and Efficient: Our dedication to client satisfaction ensures every project is completed on time and within budget.