Project

Storm Valve at IFF (formerly DuPont)

Location

Rochester, NY

Owner

International Flavors & Fragrances Inc. (IFF)

Duration

1 week

Project Overview

Westside Construction Group recently completed a technically challenging plumbing project at IFF (formerly DuPont), highlighting our capabilities in precision excavation for industrial settings, especially under challenging conditions.

Project Details

Location: Greece, NY
Scope of Work: Excavation for Inline 24" Storm Valve Installation

Project Objectives

The primary objectives of this project were to:

  • Excavate to Required Depth: Achieve a precise 12-ft excavation to accommodate an inline 24" storm valve.
  • Ensure OSHA Compliance and Safety: Maintain a controlled and safe jobsite with required OSHA shoring protections and oversight by a Competent Person.
  • Operate Under Weather Constraints: Complete the excavation despite rainy weather and wet conditions that limited maneuverability.

Challenges and Solutions

Confined Work Area and Large Machinery

  • Challenge: The site presented tight space constraints, limiting maneuverability for heavy machinery.
  • Solution: Our experienced operators used advanced techniques to optimize equipment movement, ensuring precise excavation in the confined area without compromising safety.

Adverse Weather Conditions

  • Challenge: Rainy weather and wet ground conditions made the excavation process challenging, increasing the risk of ground instability.
  • Solution: Our team implemented water control measures, adjusted workflows, and utilized specialized equipment to maintain productivity despite the conditions.

OSHA Shoring and Safety Requirements

  • Challenge: Excavating over 12 ft deep necessitated OSHA-compliant shoring protections and the presence of a Competent Person to ensure safety.
  • Solution: Westside's trained Competent Person was onsite to supervise shoring setup and oversee all operations, ensuring compliance and crew safety throughout the project.

Results

  • Accurate, Deep Excavation: Successfully excavated to the 12-ft depth required, providing the precise space needed for the 24" storm valve installation.
  • Controlled and Safe Jobsite: Implemented shoring and safety measures that maintained a zero-incident record, demonstrating our commitment to safety standards.
  • Adaptable Operations: Overcame weather and space constraints, showcasing Westside’s adaptability and commitment to delivering high-quality outcomes even under adverse conditions.

Why Choose Westside Construction Group for Excavation?

  • Experienced Personnel: Our Competent Persons are formally trained to ensure the highest level of jobsite safety.
  • Adaptable to Challenging Conditions: Westside excels in projects with complex logistical and environmental constraints.
  • Commitment to Compliance and Safety: We prioritize OSHA compliance and comprehensive safety measures to protect our team and the project integrity.
  • Reliable, Precise Results: Our team’s expertise in precise, industrial excavation ensures each project meets our high standards and client expectations.