Project
Location
Cheektowaga, NY
Owner
Life Storage
Duration
3 Weeks
Westside Construction Group recently completed a comprehensive trenching project at Life Storage in Cheektowaga, NY. The project involved saw cutting the parking lot, excavating, and installing sanitary and storm sewers, as well as catch basins. The work was completed with concrete aprons for the catch basins and asphalt patches to restore the parking lot.
The primary objectives of this project were to:
Saw cutting the parking lot required precision to ensure clean and accurate cuts for excavation.
Solution: Our team used advanced saw cutting equipment to achieve precise cuts, ensuring minimal disruption to the surrounding areas and preparing the site for trenching.
Excavating for utility installation needed to be precise to avoid existing infrastructure and ensure proper placement of new lines.
Solution: We utilized detailed site plans and advanced excavation techniques to accurately dig trenches, ensuring proper depth and alignment for the new utility lines.
Installing sanitary and storm sewers, along with catch basins, required careful planning and execution to ensure effective drainage.
Solution: Our team installed the utility lines and catch basins with precision, ensuring all connections were secure and the system functioned effectively. We followed industry standards to guarantee durability and reliability.
Restoring the parking lot to its original condition was essential for maintaining its functionality and appearance.
Solution: After installing the utility lines and catch basins, we patched the areas with concrete aprons and asphalt. Our team ensured a smooth and seamless finish, restoring the parking lot to its original state.