Project

Trenching at Life Strorage

Location

Cheektowaga, NY

Owner

Life Storage

Duration

3 Weeks

Project Overview

Westside Construction Group recently completed a comprehensive trenching project at Life Storage in Cheektowaga, NY. The project involved saw cutting the parking lot, excavating, and installing sanitary and storm sewers, as well as catch basins. The work was completed with concrete aprons for the catch basins and asphalt patches to restore the parking lot.

Project Details

Location: Cheektowaga, NY
Scope of Work: Trenching, Installation of Sanitary and Storm Sewers, Catch Basins, and Restoration

Project Objectives

The primary objectives of this project were to:

  • Saw Cut the Parking Lot: Precisely saw cut the parking lot to prepare for excavation.
  • Excavate Trenches: Perform accurate excavation for the installation of sanitary and storm sewers.
  • Install Utility Lines and Catch Basins: Install the necessary sanitary and storm sewer lines and catch basins to improve drainage.
  • Restore the Parking Lot: Patch the excavated areas with concrete aprons for the catch basins and asphalt for the parking lot.

Challenges and Solutions

Precise Saw Cutting

  • Challenge: Saw cutting the parking lot required precision to ensure clean and accurate cuts for excavation.
  • Solution: Our team used advanced saw cutting equipment to achieve precise cuts, ensuring minimal disruption to the surrounding areas and preparing the site for trenching.

Accurate Excavation

  • Challenge: Excavating for utility installation needed to be precise to avoid existing infrastructure and ensure proper placement of new lines.
  • Solution: We utilized detailed site plans and advanced excavation techniques to accurately dig trenches, ensuring proper depth and alignment for the new utility lines.

Utility Installation

  • Challenge: Installing sanitary and storm sewers, along with catch basins, required careful planning and execution to ensure effective drainage.
  • Solution: Our team installed the utility lines and catch basins with precision, ensuring all connections were secure and the system functioned effectively. We followed industry standards to guarantee durability and reliability.

Restoration of Parking Lot

  • Challenge: Restoring the parking lot to its original condition was essential for maintaining its functionality and appearance.
  • Solution: After installing the utility lines and catch basins, we patched the areas with concrete aprons and asphalt. Our team ensured a smooth and seamless finish, restoring the parking lot to its original state.

Results

  • Precise Saw Cutting: Successfully saw cut the parking lot, preparing the site for excavation with minimal disruption.
  • Accurate Excavation and Installation: Completed accurate excavation and installation of sanitary and storm sewers and catch basins, ensuring effective drainage.
  • Restored Parking Lot: Patched the parking lot with concrete aprons and asphalt, providing a seamless and functional surface.

Why Choose Westside Construction Group for Trenching Projects?

  • Expertise in Comprehensive Trenching: Our team has extensive experience in trenching projects, ensuring precise and reliable results.
  • Advanced Equipment: We use state-of-the-art equipment for all aspects of the project, from saw cutting to excavation and restoration.
  • Commitment to Quality: We prioritize quality in every aspect of our work, from initial preparation to final restoration.
  • Reliable and Efficient: Our dedication to client satisfaction ensures every project is completed on time and within budget.