Project

Trenching at Union East Elementary

Location

Cheektowaga, NY

Owner

Cheektowaga CSD

Duration

5 Weeks

Project Overview

Westside Construction Group recently completed a detailed trenching project at Union East Elementary in Cheektowaga, NY. This project involved precise excavation to install new utility lines, ensuring minimal disruption to the school’s daily activities and maintaining a safe environment for students and staff.

Project Details

  • Location: Cheektowaga, NY
  • Scope of Work: Trenching for Utility Line Installation

Project Objectives

The primary objectives of this project were to:

  1. Excavate Trenches: Perform precise trenching to install new utility lines, ensuring accuracy and safety.
  2. Install Utility Lines: Lay the new utility lines within the excavated trenches, ensuring proper connections and functionality.
  3. Minimize Disruption: Conduct the work with minimal disruption to the school's operations and ensure the safety of all students and staff.
  4. Restore the Site: Backfill and restore the site to its original condition, ensuring a clean and safe environment.

Challenges and Solutions

Working in a School Environment

Trenching in an operational school environment required careful planning to avoid disrupting classes and ensuring safety.

Solution: We scheduled our work during off-peak hours and school breaks, using safety barriers and clear signage to maintain a secure area. Our team also coordinated closely with school administrators to minimize any impact on daily activities.

Precise Trenching

Achieving accurate trenching was crucial for the proper installation of utility lines.

Solution: Our skilled team used advanced trenching equipment to ensure precise excavation, following detailed plans and specifications to achieve the required depth and alignment.

Utility Line Installation

Laying new utility lines required precision to ensure proper functionality and connections.

Solution: We carefully installed the utility lines, performing thorough checks to ensure all connections were secure and the lines were fully operational.

Site Restoration

Restoring the site to its original condition was essential to maintain the school's aesthetics and safety.

Solution: After completing the utility installation, we backfilled the trenches and restored the surface, ensuring a clean and safe environment for students and staff.

Results

  • Accurate Trenching: Successfully excavated precise trenches for the installation of new utility lines.
  • Efficient Utility Installation: Installed and connected utility lines with precision, ensuring full functionality.
  • Minimal Disruption: Conducted the project with minimal impact on the school's daily operations, maintaining a safe environment.
  • Restored Site: Backfilled and restored the site to its original condition, ensuring it was clean and safe for the school community.

Why Choose Westside Construction Group for Trenching Projects?

  • Expertise in School Environments: Our team has extensive experience working in operational school environments, ensuring minimal disruption and maximum safety.
  • Precision and Quality: We prioritize precision and quality in every aspect of our trenching projects, ensuring accurate and reliable results.
  • Commitment to Safety: We adhere to strict safety protocols to protect students, staff, and our team throughout the project.
  • Reliable Results: Our dedication to client satisfaction ensures every project meets the highest standards of quality and reliability.